Frame Posted on February 23, 2020 by David Fillman I finally got the frame down to bare metal. Took about a gallon of paint stripper, a dozen Dynabrade belts, 50 pounds of kiddie play sand (reclaimed maybe half in tarp) and way more time than I want to think about. Post Views: 645